Implementation of the Large-scale Operations Management Test in the State of Washington

Implementation of the Large-scale Operations Management Test in the State of Washington
Author: Elba A. Dardeau
Publisher:
Total Pages: 72
Release: 1982
Genre: Aquatic plants
ISBN:

During FY 79, the U.S. Army Engineer Waterways Experiment Station (WES), Vicksburg, Miss., completed the first phase of its 3-year Large-Scale Operations Management Test (LSOMT). The LSOMT was designed to develop an operational plan to identify methodologies that can be implemented by the U.S. Army Engineer District, Seattle (NPS), to prevent the exotic aquatic macrophyte Eurasian watermilfoil (Myrophyllum spicatum L.) from reaching problem-level proportions in water bodies in the state of Washington. The WES developed specific plans as integral elements of the LSOMT, including Test Site Selection, Monitoring, Reporting, Treatment, Public Awareness, and Training.