Deep Drilling in Crystalline Bedrock

Deep Drilling in Crystalline Bedrock
Author: A. Boden
Publisher: Springer Science & Business Media
Total Pages: 542
Release: 2012-12-06
Genre: Science
ISBN: 3642734553

This book presents the results of the Third International Symposium on Observation of the Continental Crust through Drilling held in Mora and Orsa, Sweden, September 7 - 10, 1987. Volume 2 reviews new and general information on geology, geophysics, rock mechanics, geochemistry, drilling techniques and drilling problems in very deep holes of the FRG, USA and the Soviet Union. The proceedings are invaluable for earth scientists as well as for exploiters of geoenergy and other natural resources in the crust. Volume 1 summarizes the results of the Deep Gas Project in the Siljan impact structure, Sweden, including papers dealing with general aspects of astroblemes. It is of interest to all researchers working in the drilling industry and those interested in the problem of "deep gas".

Salton Sea Scientific Drilling Project

Salton Sea Scientific Drilling Project
Author: Howard P. Ross
Publisher:
Total Pages: 240
Release: 1992
Genre: Borings
ISBN:

The Salton Sea Scientific g Project (SSSDP) completed the first major well in the United States Continental Scientific Drilling Program. The well (State 2-14) was drilled to 10,W ft (3,220 m) in the Salton Sea Geothermal Field in California's Imperial Valley, to permit scientific study of a deep, high-temperature portion of an active geothermal system. The program was designed to investigate, through drilling and testing, the subsurface thermal, chemical, and mineralogical environments of this geothermal area. Extensive samples and data, including cores, cuttings, geothermal fluids and gases, and geophysical logs, were collected for future scientific analysis, interpretation, and publication. Short duration flow tests were conducted on reservoirs at a depth of approximately 6,120 ft (1,865 m) and at 10,136 ft (3,089 m). This report summarizes all major activities of the SSSDP, from project inception in the fall of 1984 through brine-pond cleanup and site restoration, ending in February 1989. This report presents a balanced summary of drilling, coring, logging, and flow-test operations, and a brief summary of technical and scientific results. Frequent reference is made to original records, data, and publication of results. The report also reviews the proposed versus the final well design, and operational summaries, such as the bit record, the casing and cementing program, and the coring program. Summaries are and the results of three flow tests. Several teamed during the project.