LMIs in Control Systems

LMIs in Control Systems
Author: Guang-Ren Duan
Publisher: CRC Press
Total Pages: 482
Release: 2013-06-17
Genre: Computers
ISBN: 1466583002

Although LMI has emerged as a powerful tool with applications across the major domains of systems and control, there has been a need for a textbook that provides an accessible introduction to LMIs in control systems analysis and design. Filling this need, LMIs in Control Systems: Analysis, Design and Applications focuses on the basic analysis and d

Manpower Report of the President

Manpower Report of the President
Author: United States. President
Publisher:
Total Pages: 366
Release: 1975
Genre: Labor supply
ISBN:

Includes reports by the U.S. Dept. of Labor (called 1963- : Manpower requirements, resources, utilization and training), and the U.S. Dept. of Health, Education, and Welfare , 1975-

Assessment of the Results of External Independent Reviews for U.S. Department of Energy Projects

Assessment of the Results of External Independent Reviews for U.S. Department of Energy Projects
Author: National Research Council
Publisher: National Academies Press
Total Pages: 74
Release: 2007-05-10
Genre: Science
ISBN: 0309106397

Peer review is an essential component of engineering practice and other scientific and technical undertakings. Peer reviews are conducted to ensure that activities are technically adequate, competently performed, and properly documented; to validate assumptions, calculations, and extrapolations; and to assess alternative interpretations, methodologies, acceptance criteria, and other aspects of the work products and the documentation that support them. Effective peer reviews are conducted in an environment of mutual respect, recognizing the contributions of all participants. Their primary objective is to help the project team achieve its goals. Reviews also contribute to quality assurance, risk management, and overall improvement of the management process. The U.S. Department of Energy (DOE) conducts different types of peer reviews at the different stages of a project, including reviews to assess risks and other factors related to design, safety, cost estimates, value engineering, and project management. Independent project reviews (IPRs) are conducted by federal staff not directly affiliated with the project or program and management and operations (M&O) contractors. External independent reviews (EIRs) are overseen by the Office of Engineering and Construction Management and conducted by contractors external to the department. EIRs are the primary focus of this report. However, the committee found that, in many cases, IPRs are explicitly used as preparation for or as preliminary reviews prior to EIRs. Thus, because IPRs are integral to the review process in DOE, they are also discussed because they might have an effect on EIRs. In October 2000, DOE issued Order 413.3, Program and Project Management for the Acquisition of Capital Assets (DOE, 2000). The order established a series of five critical decisions (CDs), or major milestones, that require senior management review and approval to ensure that a project satisfies applicable mission, design, security, and safety requirements: approve mission need, approve alternative selection and cost range, approve performance baseline, approve start of construction, and approve start of operations or project closeout. Assessment of the Results of External Independent Reviews for U. S. Department of Energy Projects summarizes the results.

ETA Interchange

ETA Interchange
Author: United States. Employment and Training Administration
Publisher:
Total Pages: 510
Release: 1975
Genre: Labor supply
ISBN:

Hearings

Hearings
Author: United States. Congress. House. Committee on Appropriations
Publisher:
Total Pages: 1540
Release: 1971
Genre:
ISBN: