Design Build Project Delivery in the Air Force Reserve Command

Design Build Project Delivery in the Air Force Reserve Command
Author: Kathleen Richardson
Publisher:
Total Pages:
Release: 2009
Genre: Construction projects
ISBN:

Design Build is rapidly becoming one of the most commonly used project delivery methods in the construction industry. The United States Corp of Engineers (USACE) has started implementing its own version of Design Build with the introduction of Military Transformation in April 2005. Per the Department of the Army (2008) Military Transformation is a term employed by the Corps to implement the use of alternate project delivery method as a means of achieving best value. The United States Air Force (AF) and the Air Force Reserve Command (AFRC) are expected to establish a target of 75% of all future Military Construction Projects (MILCONs) executed when using the Design Build method. The use of this delivery method results in significant changes to the relationships between the various parties associated with facility project delivery compared to the traditional Design Bid Build method. AFRC construction project procedures and requirements must also change.

Alternative to Low Bid Selection in Air Force Reserve Military Construction

Alternative to Low Bid Selection in Air Force Reserve Military Construction
Author: Birtice A. Garner
Publisher:
Total Pages:
Release: 2009
Genre: Construction industry
ISBN:

Best value is becoming one of the most commonly used procurement methods in the facility construction industry. The Federal Government and the Air Force Reserve predominant project delivery approach has been via the low-bid award. This process has not been successful, documented by large numbers of construction modifications, as well as project cost and schedule growth over the past sixteen years. Recently, federal procurement agencies have attempted to move toward construction awards based upon best value principles relative to performance and price. The United States Army Corps of Engineers best value procurement vehicle known as Military Transformation fails to deliver true best value. This pseudo best value delivery process: (1) fails to objectively rate and apply contractor past performance; (2) lacks the means to monetarily quantify contractor proposal risks; and (3) provides no means of transferring control and responsibility for risks and risk minimization to the contractor. Only a true best value project delivery system can provide the urgently required increased efficiency necessary for Air Force Reserve Command to remain a dependable military institution capable of erecting facilities contributory to our nation's defense by perpetually adding value to the project delivery process.

Construction Delivery Methods in the United States Air Force

Construction Delivery Methods in the United States Air Force
Author: Isaak Gerard Giefer
Publisher:
Total Pages:
Release: 2019
Genre:
ISBN:

This report analyzes construction delivery method use in the United States Air Force (USAF) and determines which methods prove to be more effective and efficient and which construction delivery methods should be pursued. The construction delivery methods undergoing analysis are design-bid-build (DBB), design-build (DB), construction manager at risk (CMAR), and integrated project delivery (IPD). A literary review of previous studies on the aforementioned construction delivery methods, particularly regarding studies performed within the United States (US) federal government and US military branches is presented. The benefits for each construction delivery method is discussed, as well as the common obstacles and problems with each one. A survey was conducted in which 145 contracting officers in the USAF responded, and the survey results are analyzed and compared to those found in the literary reviews. Two major conclusions drawn from the literary review and survey are that DB should be used over DBB in most cases, and IPD should be examined as a viable USAF construction delivery method candidate. With the literary review, DB is seen as superior to DBB in almost every regard, and the surveyed contracting personnel tended to favor DB over other construction delivery methods. For higher complexity or large projects DBB can offer more control but sacrifices timeliness. IPD has data that suggests it can be a construction delivery method that is better than DB and DBB but currently cannot legally be used for USAF construction contracts because the Federal Acquisition Regulation (FAR) restricts it. DB should be defaulted to as the go to construction delivery method if the project is a viable candidate and there are not extenuating factors that suggest another method be used. It should be explored what parts of IPD can be implemented for now, while larger legislative changes to the FAR are made at the congressional level.