Waste Isolation Pilot Plant Land Withdrawal
Download Waste Isolation Pilot Plant Land Withdrawal full books in PDF, epub, and Kindle. Read online free Waste Isolation Pilot Plant Land Withdrawal ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : United States. Congress. Senate. Committee on Energy and Natural Resources. Subcommittee on Public Lands, National Parks, and Forests |
Publisher | : |
Total Pages | : 300 |
Release | : 1988 |
Genre | : New Mexico |
ISBN | : |
Author | : National Research Council |
Publisher | : National Academies Press |
Total Pages | : 156 |
Release | : 2001-06-11 |
Genre | : Science |
ISBN | : 0309183138 |
The Waste Isolation Pilot Plant (WIPP) is a deep underground mined facility for the disposal of transuranic waste resulting from the nation's defense program. Transuranic waste is defined as waste contaminated with transuranic radionuclides with half-life greater than 20 years and activity greater than 100 nanocuries per gram. The waste mainly consists of contaminated protective clothing, rags, old tools and equipment, pieces of dismantled buildings, chemical residues, and scrap materials. The total activity of the waste expected to be disposed at the WIPP is estimated to be approximately 7 million curies, including 12,900 kilograms of plutonium distributed throughout the waste in very dilute form. The WIPP is located near the community of Carlsbad, in southeastern New Mexico. The geological setting is a 600-meter thick, 250 million-year-old saltbed, the Salado Formation, lying 660 meters below the surface. The National Research Council (NRC) has been providing the U.S. Department of Energy (DOE) scientific and technical evaluations of the WIPP since 1978. The committee's task is twofold: (1) to identify technical issues that can be addressed to enhance confidence in the safe and long-term performance of the repository and (2) to identify opportunities for improving the National Transuranic (TRU) Program for waste management, especially with regard to the safety of workers and the public. This is the first full NRC report issued following the certification of the facility by the U.S. Environmental Protection Agency (EPA) on May 18, 1998. An interim report was issued by the committee in April 2000 and is reproduced in this report. The main findings and recommendations from the interim report have been incorporated into the body of this report. The overarching finding and recommendation of this report is that the activity that would best enhance confidence in the safe and long-term performance of the repository is to monitor critical performance parameters during the long pre-closure phase of repository operations (35 to possibly 100 years). Indeed, in the first 50 to 100 years the rates of important processes such as salt creep, brine inflow (if any), and microbial activity are predicted to be the highest and will be less significant later. The committee recommends that the results of the on-site monitoring program be used to improve the performance assessment for recertification purposes. These results will determine whether the need for a new performance assessment is warranted. For the National TRU Program, the committee finds that the DOE is implementing many of the recommendations of its interim report. It is important that the DOE continue its efforts to improve the packaging, characterization, and transportation of the transuranic waste.
Author | : United States. Congress. House. Committee on Commerce. Subcommittee on Energy and Power |
Publisher | : |
Total Pages | : 88 |
Release | : 1995 |
Genre | : Law |
ISBN | : |
Author | : National Research Council |
Publisher | : National Academies Press |
Total Pages | : 132 |
Release | : 2002-09-28 |
Genre | : Science |
ISBN | : 0309084601 |
The U.S. Department of Energy (DOE) disposes of plutonium-contaminated debris from its 27 nuclear weapons facilities at the Waste Isolation Pilot Plant (WIPP), an underground repository in Carlsbad, New Mexico. After four years of operational experience, DOE has opportunities to make changes to the costly and time-consuming process of "characterizing" the waste to confirm that it is appropriate for shipment to and disposal at WIPP.  The report says that in order to make such changes, DOE should conduct and publish a systematic and quantitative assessment to show that the proposed changes would not affect the protection of workers, the public, or the environment.
Author | : United States. Congress. Senate. Committee on Energy and Natural Resources |
Publisher | : |
Total Pages | : 400 |
Release | : 1992 |
Genre | : Law |
ISBN | : |
Author | : United States. Congress. Senate. Committee on Energy and Natural Resources |
Publisher | : |
Total Pages | : 642 |
Release | : 1990 |
Genre | : Eddy County (N.M.) |
ISBN | : |
Author | : United States |
Publisher | : |
Total Pages | : 20 |
Release | : 1992 |
Genre | : Public lands |
ISBN | : |
Author | : United States. Congress. Senate. Committee on Energy and Natural Resources |
Publisher | : |
Total Pages | : 398 |
Release | : 1992 |
Genre | : Law |
ISBN | : |
Author | : United States. Congress. Senate. Committee on Energy and Natural Resources. Subcommittee on Public Lands, National Parks, and Forests |
Publisher | : |
Total Pages | : 288 |
Release | : 1988 |
Genre | : Public lands |
ISBN | : |
Author | : National Academies of Sciences, Engineering, and Medicine |
Publisher | : National Academies Press |
Total Pages | : 225 |
Release | : 2020-06-01 |
Genre | : Political Science |
ISBN | : 0309498619 |
In 2018, the National Academies of Sciences, Engineering, and Medicine issued an Interim Report evaluating the general viability of the U.S. Department of Energy's National Nuclear Security Administration's (DOE-NNSA's) conceptual plans for disposing of 34 metric tons (MT) of surplus plutonium in the Waste Isolation Pilot Plant (WIPP), a deep geologic repository near Carlsbad, New Mexico. It provided a preliminary assessment of the general viability of DOE-NNSA's conceptual plans, focused on some of the barriers to their implementation. This final report addresses the remaining issues and echoes the recommendations from the interim study.