Guide for All-Hazard Emergency Operations Planning

Guide for All-Hazard Emergency Operations Planning
Author: Kay C. Goss
Publisher: DIANE Publishing
Total Pages: 277
Release: 1998-05
Genre:
ISBN: 078814829X

Meant to aid State & local emergency managers in their efforts to develop & maintain a viable all-hazard emergency operations plan. This guide clarifies the preparedness, response, & short-term recovery planning elements that warrant inclusion in emergency operations plans. It offers the best judgment & recommendations on how to deal with the entire planning process -- from forming a planning team to writing the plan. Specific topics of discussion include: preliminary considerations, the planning process, emergency operations plan format, basic plan content, functional annex content, hazard-unique planning, & linking Federal & State operations.

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants Guidance for Protective Action Strategies

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants Guidance for Protective Action Strategies
Author: U.s. Nuclear Regulation Comion
Publisher: CreateSpace
Total Pages: 32
Release: 2014-06-30
Genre: Technology & Engineering
ISBN: 9781500375027

Supplement 3, “Guidance for Protective Action Strategies,” to NUREG-0654/FEMA-REP-1, “Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,” updates the previous version of Supplement 3, “Criteria for Protective Action Recommendations for Severe Accidents,” issued July 1996. Supplement 3 provides a protective action strategy development tool based on recent technical information and is intended for use by nuclear power reactor licensees to develop site-specific protective action recommendation procedures. Offsite response organizations should use Supplement 3 to develop protective action strategy guidance for decision makers. The guidance of Supplement 3 provides an acceptable method to comply with Appendix E to Part 50, Title 10 of the Code of Federal Regulations (10 CFR) Section IV, paragraph 3 in the use of evacuation time estimates in the formulation of protective action recommendations (PARs) for the plume exposure emergency planning zone, and provides guidance for the provisions of 10 CFR 50.47(b)(10) in the development of a range of PARs. Supplement 3 also provides guidance to support the information in NUREG-0654/FEMA-REP-1 that the U.S. Nuclear Regulatory Commission finds to be an acceptable method of meeting the requirements in 10 CFR 50.47(b)(7) for the development of a public information program. However, licensees may identify alternative methods of compliance with these requirements.