Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002
Author: R. B. Jackson
Publisher:
Total Pages: 171
Release: 2003
Genre:
ISBN:

This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May and November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004
Author: BECHTEL NEVADA.
Publisher:
Total Pages:
Release: 2005
Genre:
ISBN:

This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and anchoring straw bales in the wash to help control erosion at the Five Points Landfill. CAU 407 repairs included erosion repair, reseeding the cover, and replacement of one warning sign. CAU 424 repairs included filling topographically low areas to the surrounding grade. This was performed at Landfill Cell A3-1 (CAS 03-08-001-A301) and Landfill Cell A3-4 (CAS 03-08-002-A304). CAU 427 maintenance activities included placing additional red rocks over the subsurface site markers during the July inspection to assist in locating them for future inspections. CAU 487 repairs included installing eight above-grade monuments to mark the use restriction boundaries, installing use restriction warning signs, stamping coordinates on the brass survey markers, and subsidence repair at the A-8 anomaly. With the completion of these repairs and maintenance activities, all CAUs were in excellent condition at the end of 2004. The site inspections should continue as scheduled, and any potential problem areas, such as repaired areas of erosion or subsidence, should be monitored closely for further maintenance or repair needs.

Post-Closure Inspection Report for Corrective Action Unit 407

Post-Closure Inspection Report for Corrective Action Unit 407
Author:
Publisher:
Total Pages: 5
Release: 2002
Genre:
ISBN:

Post-closure monitoring requirements for the Roller Coaster RadSafe Area (Corrective Action Unit [CAU] 407) (Figure 1) are described in Closure Report for Corrective Action Unit 407, Roller Coaster RadSafe Area, Tonopah Test Range, Nevada, report number DOEN-694, October 2001. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on April 24,2001. No issues with the post-closure monitoring plan, Section 5 .O, were raised. However, other concerns raised by stakeholders required that the CR be revised. Revision 1 of CR was issued in December of 2001 and was approved by NDEP on January 7,2002. Section 5.2 of the NDEP-approved CR calls for site inspections to be conducted within the first six months following completion of cover construction. Following the first six months, site inspection are to be conducted twice yearly for the next two years. This report provides the results of the six month post-construction site inspection. As stated in Section 5.2 of the CR, Post-closure site inspections at CAU 407 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. To meet the fiscal year 2002 post-closure inspection schedule, the first post-closure site inspection was conducted on November 6,2001. The site inspection was conducted after completion of the revegetation activities (October 24,2000) and submittal of revision 0 of the CR (October 31,2001). All site inspections were conducted in accordance with the Post-Closure Inspection requirements stated in revision 0 of the CR. This report includes copies of inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklist is found in Attachment A, a copy of the field notes is found in Attachment By and copies of the inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 404

Post-Closure Inspection Report for Corrective Action Unit 404
Author:
Publisher:
Total Pages: 5
Release: 2002
Genre:
ISBN:

Post-closure monitoring requirements for the Roller Coaster Lagoons and Trench (Corrective Action Unit [CAU] 404) (Figure 1) are described in Closure Report for Corrective Action Unit 404. Roller Coaster Sewage Lagoons and North Disposal Trench. Tonopah Test Range. Nevada, report number DOE/NV--187, September 1998. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. As stated in Section 5.0 of the NDEP-approved CRY post-closure monitoring at CAU 404 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. In addition to the above activities, vegetative monitoring of the cover (a plant census) will be done in the first, third and fifth year following revegetation. (Vegetative monitoring will done in fiscal year 2001, and the results reported in the 2002 Post-Closure Inspection Report.) Site inspections were conducted on May 16, 2001, and November 6, 2001. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

Calendar Year 2002 Annual Site Environmental Report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii

Calendar Year 2002 Annual Site Environmental Report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii
Author: Rebecca V. Sanchez
Publisher:
Total Pages: 158
Release: 2003
Genre:
ISBN:

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).

Post-Closure Inspection Report for Corrective Action Unit 453

Post-Closure Inspection Report for Corrective Action Unit 453
Author:
Publisher:
Total Pages: 31
Release: 2001
Genre:
ISBN:

Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 426

Post-Closure Inspection Report for Corrective Action Unit 426
Author:
Publisher:
Total Pages: 36
Release: 2001
Genre:
ISBN:

Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [CAW 426]) (Figure 1) are described in Closure Report for corrective Action Unit 426, Cactus Spring Waste Trenches. Tonopah Test Range, Nevada, report number DOE/NV--226. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 14, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 13, 1999. Post-closure monitoring at CAU 426 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 453

Post-Closure Inspection Report for Corrective Action Unit 453
Author:
Publisher:
Total Pages: 5
Release: 2002
Genre:
ISBN:

Post-closure monitoring requirements for the Area 9 Unexploded Ordinance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284, August 1999. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 453 consists of the following: (1) Visual site inspections are conducted twice a year to evaluate the condition of the cover. (2) Verification that the site is secure and the condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 15, 2001 and November 6, 2001. Both site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 426

Post-Closure Inspection Report for Corrective Action Unit 426
Author:
Publisher:
Total Pages: 5
Release: 2002
Genre:
ISBN:

Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [CAU] 426) (Figure 1) are described in Closure Report for Corrective Action Unit 426, Cactus Spring Waste Trenches, Tonopah Test Range. Nevada, report number DOE/NV--226, August 1998. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 14, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 13, 1999. As stated in Section 5.0 of the NDEP-approved CRY Post-Closure Monitoring Plan, site monitoring at CAU 426 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.