Supplement Analysis For The Transmission System Vegetation Management Program Feis Doe Eis 0285 Sa 127 Eugene Alvey2
Download Supplement Analysis For The Transmission System Vegetation Management Program Feis Doe Eis 0285 Sa 127 Eugene Alvey2 full books in PDF, epub, and Kindle. Read online free Supplement Analysis For The Transmission System Vegetation Management Program Feis Doe Eis 0285 Sa 127 Eugene Alvey2 ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : |
Publisher | : |
Total Pages | : 11 |
Release | : 2003 |
Genre | : |
ISBN | : |
BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV.
Author | : |
Publisher | : |
Total Pages | : 16 |
Release | : 2003 |
Genre | : |
ISBN | : |
BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7.
Author | : |
Publisher | : |
Total Pages | : 17 |
Release | : 2002 |
Genre | : |
ISBN | : |
BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action.
Author | : |
Publisher | : |
Total Pages | : 17 |
Release | : 2002 |
Genre | : |
ISBN | : |
Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV.
Author | : |
Publisher | : |
Total Pages | : 58 |
Release | : 2002 |
Genre | : |
ISBN | : |
Vegetation Management for the following electric yards located in the Ross District: Cape Horn, North Bonneville, Stevenson, Carson, Underwood, Troutdale, Cascade Locks, Acton Ross 345 kilovolts and J.D., Alcoa, Sifton, St. Johns, Ostrander, McLoughlin. BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region's Ross District.
Author | : |
Publisher | : |
Total Pages | : 13 |
Release | : 2003 |
Genre | : |
ISBN | : |
BPA proposes to clear targeted vegetation within the right-of-way, along access roads and around towers that may impede the operation and maintenance of the subject transmission lines.
Author | : |
Publisher | : |
Total Pages | : 13 |
Release | : 2003 |
Genre | : |
ISBN | : |
Bonneville Power Administration (BPA) proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.
Author | : |
Publisher | : |
Total Pages | : 63 |
Release | : 2002 |
Genre | : |
ISBN | : |
BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within The Dalles District of the Redmond Region.
Author | : |
Publisher | : |
Total Pages | : 4 |
Release | : 2002 |
Genre | : |
ISBN | : |
Vegetation Management for Substations and Non-Electric Facilities in the Walla Walla Region. BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare ground management of perimeter roads and parking areas; 2) mechanical and/or spot herbicidal control of some broadleaves and noxious weeds; 3) mowing, fertilizing, and broadleaf control of landscaped lawn areas; 4) weed control in ornamental shrub areas; and 4) areas requiring only mechanical control to manage unwanted/danger trees, grasses, and shrubs.
Author | : |
Publisher | : |
Total Pages | : 44 |
Release | : 2002 |
Genre | : |
ISBN | : |
Vegetation Management for ten Substations in the Redmond District. BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region.