The Nuclear Energy Center siting opportunities in the eleven western states have been systematically examined. The study area has been divided into 10-mile by 10-mile grid cells, and each cell has been evaluated in terms of overall suitability and site-related costs. Composite suitability consists of a weighted sum of ten important nuclear power plant siting issues; the particular weights used for this study were decided by a Delphi session of twenty individuals with energy facility siting expertise, with at least one representative from each of the eleven western states. Site-related costs consist of the additional expenditures required for seismic hardening (in seismically active areas), electric power transmission lines (for sites significantly far from load centers), and wet/dry cooling system costs (limited water availability and/or high summer temperatures).

Nuclear Energy Center

Nuclear Energy Center
Author:
Publisher:
Total Pages:
Release: 1976
Genre:
ISBN:

This report is one of many supporting documents used by the Nuclear Regulatory commission in the preparation of the Nuclear Energy Center Site Survey (NECSS) mandated by Congress. While the overall study focuses on the feasibility and practicability of nuclear energy centers (NECs), this report is directed towards choosing a suitable surrogate site in the upper St. Lawrence region of New York State, assessing the probable impacts associated with construction and operation of the NEC, and comparing these impacts with those associated with small dispersed nuclear power stations. The upper St. Lawrence region is surveyed to identify a specific site that might be suitable for a surrogate NEC. Several assumptions about the basic design of an NEC are delineated, and a general overview of the characteristics of the region is given. The Fort Drum Military Reservation is chosen as a suitable surrogate site. Fort Drum and the surrounding area are described in terms of land use and population patterns, terrestrial and aquatic ecology, water use and quality, meteorology, institutional framework, and socioeconomic structure. The impacts associated with NEC development are assessed. Then the impacts associated with smaller dispersed nuclear power stations located throughout New York State are assessed and compared with the impacts associated with the NEC. Finally, the impacts due to development of the transmission line networks associated with the NEC and with the dispersed power stations are assessed and compared.

Utility Survey on Nuclear Power Plant Siting and Nuclear Energy Centers

Utility Survey on Nuclear Power Plant Siting and Nuclear Energy Centers
Author:
Publisher:
Total Pages:
Release: 1977
Genre:
ISBN:

Most of the large U.S. utilities were surveyed by telephone and mail on questions concerning nuclear power plant siting and nuclear energy centers (NECs). The main purpose of the survey was for guidance of ERDA's NEC program. The questions covered the following topics: availability of sites; impact of environmental and other restraints; plans for development of multi-unit sites; interest in NEC development; interest in including fuel-cycle facilities in NECs; and opinions on the roles desired for the state and Federal governments in power plant siting. The main conclusion of the survey was that, while many utilities were considering multiple-unit sites of 2 to 5 units, none were planning larger energy centers at the present time. However, several expressed interest in NECs as a long-range future development.