Design and Construction of the Defense Waste Processing Facility Project at the Savannah River Plant

Design and Construction of the Defense Waste Processing Facility Project at the Savannah River Plant
Author:
Publisher:
Total Pages:
Release: 1986
Genre:
ISBN:

The Du Pont Company is building for the Department of Energy a facility to vitrify high-level radioactive waste at the Savannah River Plant (SRP) near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes by immobilizing the waste in Processing Facility (DWPF) will solidify existing and future radioactives wastes by immobilizing the waste in borosilicate glass contained in stainless steel canisters. The canisters will be sealed, decontaminated and stored, prior to emplacement in a federal repository. At the present time, engineering and design is 90% complete, construction is 25% complete, and radioactive processing in the $870 million facility is expected to begin by late 1989. This paper describes the SRP waste characteristics, the DWPF processing, building and equipment features, and construction progress of the facility.

High Level Waste Vitrification at the SRP (Savannah River Plant) (DWPF (Defense Waste Processing Facility) Summary).

High Level Waste Vitrification at the SRP (Savannah River Plant) (DWPF (Defense Waste Processing Facility) Summary).
Author:
Publisher:
Total Pages:
Release: 1988
Genre:
ISBN:

The Savannah River Plant has been operating a nuclear fuel cycle since the early 1950's. Fuel and target elements are fabricated and irradiated to produce nuclear materials. After removal from the reactors, the fuel elements are processed to extract the products, and waste is stored. During the thirty years of operation including evaporation, about 30 million gallons of high level radioactive waste has accumulated. The Defense Waste Processing Facility (DWPF) under construction at Savannah River will process this waste into a borosilicate glass for long-term geologic disposal. The construction of the DWPF is about 70% complete; this paper will describe the status of the project, including design demonstrations, with an emphasis on the melter system. 9 figs.