Santa Ana River Mainstem Including Santiago Creek California Phase Ii General Design Memorandum Oak Street Drain
Download Santa Ana River Mainstem Including Santiago Creek California Phase Ii General Design Memorandum Oak Street Drain full books in PDF, epub, and Kindle. Read online free Santa Ana River Mainstem Including Santiago Creek California Phase Ii General Design Memorandum Oak Street Drain ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Draft Phase I General Design Memorandum, Santa Ana River Main Stem, Including Santiago Creek and Oak Street Drain
Author | : United States. Army. Corps of Engineers. Los Angeles District |
Publisher | : |
Total Pages | : |
Release | : 1980 |
Genre | : Flood control |
ISBN | : |
Santa Ana River Main Stem, Including Santiago Creek and Oak Street Drain
Author | : United States Army Corps of Engineers Los Angeles District |
Publisher | : |
Total Pages | : |
Release | : 1980 |
Genre | : Flood control |
ISBN | : |
Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 7. Hydrology
Author | : ARMY ENGINEER DISTRICT LOS ANGELES CA. |
Publisher | : |
Total Pages | : 257 |
Release | : 1988 |
Genre | : |
ISBN | : |
This volume contains hydrologic information in support of the general design consideration for Seven Oaks Dam, Prado Dam, Santa Ana River mainstem between Seven Oaks Dam and Prado Dam, Mill Creek levee, Oak street Drain, Santiago Creek, and lower Santa Ana River. (FR).
Santa Ana River Main Stem, Including Santiago Creek and Oak Street Drain, California
Author | : United States. Army. Corps of Engineers |
Publisher | : |
Total Pages | : 624 |
Release | : 1978 |
Genre | : California |
ISBN | : |
Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem, Including Santiago Creek. Volume 5. Oak Street Dam
Author | : ARMY ENGINEER DISTRICT LOS ANGELES CA. |
Publisher | : |
Total Pages | : 225 |
Release | : 1988 |
Genre | : |
ISBN | : |
The recommended plan for Oak street Drain consists of a concrete channel beginning at the existing Oak Street debris basin and extending over 3 miles to the confluence with Temescal Wash. The channel is designed to provide 100-year level of protection. Total project first cost is estimated at $20,652,000. The economic data for the project is contained in Volume 9, 'Economics and Public Comment and Response.' (FR).
Santa Ana River Main Stem, Santiago Creek and Oak Street Drain
Author | : United States. Army. Corps of Engineers. Los Angeles District |
Publisher | : |
Total Pages | : 32 |
Release | : 1979 |
Genre | : Flood control |
ISBN | : |