Comprehensive Basin Study, Red River Below Denison Dam

Comprehensive Basin Study, Red River Below Denison Dam
Author: United States Department Of Agriculture
Publisher: Forgotten Books
Total Pages: 146
Release: 2018-03-20
Genre: Business & Economics
ISBN: 9780365070870

Excerpt from Comprehensive Basin Study, Red River Below Denison Dam: Usda Implementation Plan; May 1971 Comprehensive planning of the Red River Basin below Denison Dam began in January, 1963. A report documenting the study was completed in June, 1968. Planning was directed by a Field Coordinating Committee composed of representatives of the U. S. Departments of Agriculture; Army; Commerce; Health, Education, and Welfare; Interior; the Federal Power Commission; and the four states involved Arkansas, Louisiana Oklahoma, and Texas. The New Orleans District of the Corps of Engineers acted as chair agency for the Committee. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Comprehensive Basin Study. Red River Below Denison Dam, Arkansas, Louisiana, Oklahoma, and Texas. Volume 8. Appendix XV.

Comprehensive Basin Study. Red River Below Denison Dam, Arkansas, Louisiana, Oklahoma, and Texas. Volume 8. Appendix XV.
Author: RED RIVER BASIN COORDINATING COMMITTEE NEW ORLEANS LA.
Publisher:
Total Pages: 184
Release: 1968
Genre:
ISBN:

This appendix presents the proposed comprehensive plan of development for the basin and describes and analyzes the planning processes leading to its development. The plan is designed to meet existing and anticipated water and associated land resource needs of the Red River Basin below Denison Dam for the next 100 years. These needs include: water supply for municipal, industrial and irrigation uses; water quality control; flood control; drainage; watershed protection and flood prevention; navigation; bank stabilization; hydroelectric power, grazing and cropland improvements; forestry production; outdoor recreation; fish and wildlife enhancement; regional development; environmental preservation; and control of disease-bearing vectors. The plan is developed in sufficient detail to be used as a basis for obtaining Congressional authorization for projects required within the next 10-15 years, as well as providing a framework for future development of the basin's resources. The formulation process recognized that increasing the national wealth, encouraging economic development in the Red River Basin, and preserving and enhancing the physical environment of the basin are all appropriate objectives of water resource development. In developing the plan, alternative projects and plans to satisfy the various needs of the basin were assembled. These alternative projects were then evaluated and compared to isolate those that would contribute most to the basin's economy. The basic yardstick utilized in comparing alternatives was the national efficiency objective. The use of this yardstick was, however, tempered by consideration of the less tangible economic and social impacts of the alternative projects.