Preliminary Engineering Approval for the Regional Connector Transit Corridor Project
Author | : Arthur T. Leahy |
Publisher | : |
Total Pages | : 4 |
Release | : 2011 |
Genre | : Railroads, Local and light |
ISBN | : |
Download Preliminary Engineering Approval For The Regional Connector Transit Corridor Project full books in PDF, epub, and Kindle. Read online free Preliminary Engineering Approval For The Regional Connector Transit Corridor Project ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : Arthur T. Leahy |
Publisher | : |
Total Pages | : 4 |
Release | : 2011 |
Genre | : Railroads, Local and light |
ISBN | : |
Author | : Los Angeles County Metropolitan Transportation Authority |
Publisher | : |
Total Pages | : |
Release | : 2015 |
Genre | : Los Angeles (Calif.) |
ISBN | : |
This Supplemental Environmental Impact Statement (SEIS) is intended to provide more information on the tunnel construction alternatives on Flower Street that were withdrawn from consideration, specifically Open-Face Shield and Sequential Excavation Method (SEM) tunneling for the Flower Street portion of the Regional Connector project alignment between 4th Street and the 7th Street/Metro Center Station.
Author | : Davidson, Gregg |
Publisher | : Society for Mining, Metallurgy, and Exploration |
Total Pages | : 1214 |
Release | : 2014-06-17 |
Genre | : Technology & Engineering |
ISBN | : 0873354001 |
The North American Tunneling Conference is the premier forum to discuss new trends and developments in underground construction in North America. With every conference, the number of attendees and breadth of topics grows. North American Tunneling: 2014 Proceedings reflects the theme for the 2014 conference, “Mission Possible.” The authors share new theories, novel innovations, and the latest tools that make what once may have been perceived as impossible, now possible. The authors of 128 papers share the latest case histories, expertise, lessons learned, and real-world applications from around the globe on a wide range of topics. They cover the successes and failures of challenging construction projects. Read about challenging design issues, fresh approaches on performance, future projects, and industry trends as well as ground movement and support, structure analysis, risk and cost management, rock tunnels, caverns and shafts, TBM technology and selection, and water and wastewater conveyance.
Author | : Los Angeles County Metropolitan Transportation Authority |
Publisher | : |
Total Pages | : |
Release | : 2010 |
Genre | : Railroads, Local and light |
ISBN | : |
Author | : Praeger-Kavanagh-Waterbury, New York |
Publisher | : |
Total Pages | : |
Release | : 1971 |
Genre | : Local transit |
ISBN | : |
Author | : Transit & Tunnel Consultants |
Publisher | : |
Total Pages | : 94 |
Release | : 1983 |
Genre | : Subway tunnels |
ISBN | : |
Author | : United States. Congress. House. Committee on Appropriations |
Publisher | : |
Total Pages | : 216 |
Release | : 2001 |
Genre | : United States |
ISBN | : |
Author | : Los Angeles County Metropolitan Transportation Authority |
Publisher | : |
Total Pages | : 0 |
Release | : 2011 |
Genre | : Local transit |
ISBN | : |
The chapter/section numbers in this document and table of contents only include chapters/sections from the draft EIS/EIR that have been updated or been added since publication of the original draft EIS/EIR.