Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009
Author:
Publisher:
Total Pages:
Release: 2010
Genre:
ISBN:

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 5-6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation monitoring at the CAU 400 Five Points Landfill and CAU 407 should continue.

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002
Author: R. B. Jackson
Publisher:
Total Pages: 171
Release: 2003
Genre:
ISBN:

This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May and November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004
Author: BECHTEL NEVADA.
Publisher:
Total Pages:
Release: 2005
Genre:
ISBN:

This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and anchoring straw bales in the wash to help control erosion at the Five Points Landfill. CAU 407 repairs included erosion repair, reseeding the cover, and replacement of one warning sign. CAU 424 repairs included filling topographically low areas to the surrounding grade. This was performed at Landfill Cell A3-1 (CAS 03-08-001-A301) and Landfill Cell A3-4 (CAS 03-08-002-A304). CAU 427 maintenance activities included placing additional red rocks over the subsurface site markers during the July inspection to assist in locating them for future inspections. CAU 487 repairs included installing eight above-grade monuments to mark the use restriction boundaries, installing use restriction warning signs, stamping coordinates on the brass survey markers, and subsidence repair at the A-8 anomaly. With the completion of these repairs and maintenance activities, all CAUs were in excellent condition at the end of 2004. The site inspections should continue as scheduled, and any potential problem areas, such as repaired areas of erosion or subsidence, should be monitored closely for further maintenance or repair needs.

Post-Closure Inspection Report for Corrective Action Unit 453

Post-Closure Inspection Report for Corrective Action Unit 453
Author:
Publisher:
Total Pages: 5
Release: 2002
Genre:
ISBN:

Post-closure monitoring requirements for the Area 9 Unexploded Ordinance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284, August 1999. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 453 consists of the following: (1) Visual site inspections are conducted twice a year to evaluate the condition of the cover. (2) Verification that the site is secure and the condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 15, 2001 and November 6, 2001. Both site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 453

Post-Closure Inspection Report for Corrective Action Unit 453
Author:
Publisher:
Total Pages: 31
Release: 2001
Genre:
ISBN:

Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 424

Post-Closure Inspection Report for Corrective Action Unit 424
Author:
Publisher:
Total Pages: 53
Release: 2001
Genre:
ISBN:

Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eight landfill sites, Corrective Action Sites (CASS), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the locations of the landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan contained, in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range. Nevada, report number DOE/NV--283. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. Post-closure monitoring consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000, and November 20, 2000. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist and photographs, and recommendations and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 424

Post-Closure Inspection Report for Corrective Action Unit 424
Author:
Publisher:
Total Pages: 5
Release: 2002
Genre:
ISBN:

Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of eight Corrective Action Sites (CASs), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the general location of the landfill cells. Figure 2 shows in more detail the location of the eight landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan, contained in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complexes, Tonopah Test Range, Nevada, report number DOE/NV--283, July 1999. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 424 consists of the following: (1) Site inspections conducted twice a year to evaluate the condition of the unit. (2) Verification that landfill markers and warning signs are in-place, intact, and readable. (3) Notice of any subsidence, erosion, unauthorized use, or deficiencies that may compromise the integrity of the landfill covers. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

Post-Closure Inspection Report for Corrective Action Unit 426

Post-Closure Inspection Report for Corrective Action Unit 426
Author:
Publisher:
Total Pages: 36
Release: 2001
Genre:
ISBN:

Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [CAW 426]) (Figure 1) are described in Closure Report for corrective Action Unit 426, Cactus Spring Waste Trenches. Tonopah Test Range, Nevada, report number DOE/NV--226. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 14, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 13, 1999. Post-closure monitoring at CAU 426 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

ERRATA SHEET for Post-Closure Inspection Report for Corrective Action Unit 407

ERRATA SHEET for Post-Closure Inspection Report for Corrective Action Unit 407
Author:
Publisher:
Total Pages: 1
Release: 2002
Genre:
ISBN:

The fifth sentence of the first paragraph on Page 1 of the Post Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area, Tonopah Test Range, Nevada erroneously states that Revision 1 of the CR was issued in December of 2001 and was approved by NDEP on January 7, 2002. The sentence should state that Revision 1 of the CR was issued in December of 2001 and was approved by NDEP on February 22, 2002.