No Further Action Decision Document for Study Area P51, One Drum Near White Pond Road, Fort Devens Sudbury Training Annex. Revision

No Further Action Decision Document for Study Area P51, One Drum Near White Pond Road, Fort Devens Sudbury Training Annex. Revision
Author:
Publisher:
Total Pages: 27
Release: 1995
Genre:
ISBN:

This report is a Final No Further Action Decision Document for Study Area P51, One Drum Near White Pond Road at the Fort Devens Sudbury Training Annex located in Sudbury, Massachusetts. This NFADD explains why no further investigation or remediation is required at Area P5l. The NFADD provides a review of soil investigation results and a comparison of the results to applicable human health and ecological standards.

No Further Action Decision Document for Study Area P19, Clearing, Tracked Road, Fort Devens Sudbury Training Annex

No Further Action Decision Document for Study Area P19, Clearing, Tracked Road, Fort Devens Sudbury Training Annex
Author:
Publisher:
Total Pages: 26
Release: 1995
Genre:
ISBN:

This report is a Final No Further Action Decision Document for Study Area P19, Clearing, Tracked Road at the Fort Devens Sudbury Training Annex located in Sudbury, Massachusetts. This NFADD explains why no further investigation or remediation is required at Area P19. The NFADD provides a review of the site reconnaissance and soil sampling results to applicable human health and ecological standards.

No Further Action Decision Document for Study Area P7, Patrol Road Waste Area, Fort Devens Sudbury Training Annex

No Further Action Decision Document for Study Area P7, Patrol Road Waste Area, Fort Devens Sudbury Training Annex
Author:
Publisher:
Total Pages: 34
Release: 1995
Genre:
ISBN:

This report is a Final No Further Action Decision Document for Study Area p7, Patrol Road Waste Area at the Fort Devens Sudbury Training Annex located in Sudbury, Massachusetts. This NFADD explains why no further investigation or remediation is required at Area P7. The NFADD provides a review of soil and groundwater investigation results and a comparison of the results to applicable human health and ecological standards. (AN).

No Further Action Decision Under CERCLA Study Area 59: Bridge 526. Fort Devens Main Post Site Investigation, Fort Devens, Massachusetts

No Further Action Decision Under CERCLA Study Area 59: Bridge 526. Fort Devens Main Post Site Investigation, Fort Devens, Massachusetts
Author:
Publisher:
Total Pages: 26
Release: 1995
Genre:
ISBN:

Investigations of Study Area 59 (Bridge 526) at Fort Devens, Massachusetts, have resulted in the decision that no further studies or remediation are required at this site. Study Area 59 was identified in the Federal Facilities Agreement between the U.S. Environmental Protection Agency and the U.S. Department of Defense as a potential site of contamination. Fort Devens was placed on the National Priorities List under the Comprehensive Environmental Response, Compensation and Liability Act as amended by the Superfund Amendments and Reauthorization Act on December, 21, 1989. In addition, under Public Law 101-510, the Defense Base Realignment and Closure Act of 1990, Fort Devens was selected for cessation of operations and closure. In accordance with these acts and to support the overall mission of environmental restoration and base closure, numerous studies have been conducted that address study areas at Fort Devens, including a Master Environmental Plan (Argonne National Laboratory, 1992), an Enhanced Preliminary Assessment (Weston, 1992), and Site Investigation Reports (ABB, 1992 and Arthur D. Little, 1993a).

No Further Action Decision Under CERCLA Study Area 10: Construction Debris Area. Fort Devens Main Post Site Investigation, Fort Devens, Massachusetts

No Further Action Decision Under CERCLA Study Area 10: Construction Debris Area. Fort Devens Main Post Site Investigation, Fort Devens, Massachusetts
Author:
Publisher:
Total Pages: 38
Release: 1995
Genre:
ISBN:

Investigations of Study Area 10 (Construction Debris Area) at Fort Devens, Massachusetts, have resulted in the decision that no further studies or remediation are required at this site. Study Area 10 was identified in the Federal Facilities Agreement between the U.S. Environmental Protection Agency and the U.S. Department of Defense as a potential site of contamination. Fort Devens was placed on the National Priorities List under the Comprehensive Environmental Response, Compensation and Liability Act as amended by the Superfund Amendments and Reauthorization Act on December, 21, 1989. In addition, under Public Law 101-510, the Defense Base Realignment and Closure Act of 1990, Fort Devens was selected for cessation of operations and closure. In accordance with these acts and to support the overall mission of environmental restoration and base closure, numerous studies have been conducted that address Study Areas at Fort Devens, including a Master Environmental Plan, an Enhanced Preliminary Assessment, and Site Investigation Reports.

Record of Decision Operable Units 4 and 5, Sudbury Training Annex, Middlesex County, Massachusetts

Record of Decision Operable Units 4 and 5, Sudbury Training Annex, Middlesex County, Massachusetts
Author:
Publisher:
Total Pages: 0
Release: 1996
Genre:
ISBN:

This decision document presents the decision for No Action at Operable Units (OUs) 4 and 5, Sudbury Training Annex, Middlesex County, Massachusetts. It was developed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) as amended, 40 CFR Part 300, to the extent practicable. The Sudbury Training Annex Base Realignment and Closure (BRAC) Environmental Coordinator; the Installation Commander; and the Director of the Office of Site Remediation and Restoration, U.S. Environmental Protection Agency New England (USEPA) have been delegated the authority to approve this Record of Decision.