National Dam Safety Program Lake Topanemus Dam Nj 00219 Raritan River Basin Mcgellairds Brook Monmouth County New Jersey Phase I Inspection Report
Download National Dam Safety Program Lake Topanemus Dam Nj 00219 Raritan River Basin Mcgellairds Brook Monmouth County New Jersey Phase I Inspection Report full books in PDF, epub, and Kindle. Read online free National Dam Safety Program Lake Topanemus Dam Nj 00219 Raritan River Basin Mcgellairds Brook Monmouth County New Jersey Phase I Inspection Report ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : Anthony G. Posch |
Publisher | : |
Total Pages | : 90 |
Release | : 1979 |
Genre | : |
ISBN | : |
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).
Author | : Harris-ECI Associates |
Publisher | : |
Total Pages | : 174 |
Release | : 1979 |
Genre | : Dam safety |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 368 |
Release | : 1979 |
Genre | : Science |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 980 |
Release | : 1980 |
Genre | : Government reports announcements & index |
ISBN | : |
Author | : Anthony G. Posch |
Publisher | : |
Total Pages | : 95 |
Release | : 1979 |
Genre | : |
ISBN | : |
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).
Author | : Robert J. Jenny |
Publisher | : |
Total Pages | : 124 |
Release | : 1979 |
Genre | : |
ISBN | : |
This rport cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).
Author | : Warren A. Guinan |
Publisher | : |
Total Pages | : 78 |
Release | : 1981 |
Genre | : |
ISBN | : |
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hyraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. Based on visual inspection, available records, calculations and past operational performance, Helmetta Pond Dam initially listed as a high hazard potential structure, but reduced to a significant hazard potential structure as a result of this inspection, is judged to be in poor overall condition. The dam's spillway is considered inadequate because a flow equivalent to 12 percent of the Spillway Design Flood - SDF - would cause the dam to be overtopped. The (SDF, in this instance, is one half of the Probable Maximum Flood).
Author | : Richard McDermott |
Publisher | : |
Total Pages | : 79 |
Release | : 1979 |
Genre | : |
ISBN | : |
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).
Author | : Robert Gershowitz |
Publisher | : |
Total Pages | : 111 |
Release | : 1978 |
Genre | : |
ISBN | : |
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).
Author | : Robert Gershowitz |
Publisher | : |
Total Pages | : 107 |
Release | : 1978 |
Genre | : |
ISBN | : |
This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author).