Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement
Author:
Publisher:
Total Pages: 368
Release: 2002-02-01
Genre:
ISBN: 9781423505259

The Corps of Engineers, along with the Bonneville Power Administration, U.S. Environmental Protection Agency, and U.S. Bureau of Reclamation as cooperating agencies, analyzed four general alternatives intended to provide information on the technical, environmental, and economic effects of actions related to improving juvenile salmon passage. The four alternatives include Alternative 1-Existing Conditions (the no-action alternative) and three different ways to further improve juvenile salmon passage. The action alternatives are as follows: Alternative 2- Maximum Transport of Juvenile Salmon; Alternative 3-Major System Improvements; and Alternative 4-Dam Breaching. Based on a thorough examination of the best available biological, economic, social, and other environmental information, Alternative 3-Major System Improvements has been selected as the recommended plan (preferred alternative).

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement
Author:
Publisher:
Total Pages: 547
Release: 2003-02-01
Genre:
ISBN: 9781423505242

This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (adaptive Migration) as the recommended plan (preferred alternative) and explains the process for selecting the alternative.

Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix J: Plan Formulation

Lower Snake River Juvenile Salmon Migration Feasibility Report/Environmental Impact Statement. Appendix J: Plan Formulation
Author:
Publisher:
Total Pages: 119
Release: 2002
Genre:
ISBN:

This Final Feasibility Report/Environmental Impact Statement (RE/EIS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U S Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix C

Lower Snake River Juvenile Salmon Migration Feasibility Report/ Environmental Impact Statement. Appendix C
Author:
Publisher:
Total Pages: 207
Release: 2002-02-01
Genre:
ISBN: 9781423505198

This Final Feasibility Report/Environmental Impact Statement (RE/ElS) and its 21 appendices document the results of a comprehensive analysis of the four dams on the lower Snake River (collectively called the Lower-Snake River Project) and their effects on four lower Snake River salmon and steelhead stocks listed for protection under the Endangered Species Act (ESA). The U.S. Army Corps of Engineers (Corps), along with Bonneville Power Agency (BPA), U.S. Environmental Protection Agency (EPA), and U.S. Bureau of Reclamation (BOR) as cooperating agencies, analyzed four alternatives to evaluate the best way to improve juvenile salmon migration through Lower Snake River Project. The Final FR/EIS includes the best available information on the biological effectiveness, engineering components, costs, economic effects, and other environmental effects associated with the four alternatives: Alternative 1-Existing Conditions, Alternative 2-Maximum Transport of Juvenile Salmon, Alternative 3-Major System Improvements (Adaptive Migration), and Alternative 4-Dam Breaching. In the Final FR/EIS, the Corps identifies Alternative 3-Major System Improvements (Adaptive Migration as the recommended plan (preferred alternative) and explains the process for selecting that alternative.