Hood River and Pelton Ladder Evaluation Studies and Hood River Fish Habitat Project, 1998 Annual Progress Report

Hood River and Pelton Ladder Evaluation Studies and Hood River Fish Habitat Project, 1998 Annual Progress Report
Author:
Publisher:
Total Pages: 137
Release: 1999
Genre:
ISBN:

The Hood River subbasin is home to four species of anadromous salmonids: chinook salmon (Oncorhynchus tshawytscha), coho salmon (Oncorhynchus kisutch), steelhead (Oncorhynchus mykiss), and sea run cutthroat trout (Salmo clarki). Indigenous spring chinook salmon were extirpated during the late 1960's. The naturally spawning spring chinook salmon currently present in the subbasin are progeny of Deschutes stock. Historically, the Hood River subbasin hatchery steelhead program utilized out-of-basin stocks for many years. Indigenous stocks of summer and winter steelhead were listed in March 1998 by National Marine Fisheries Service (NMFS) under the Endangered Species Act (ESA) as a ''Threatened'' Species along with similar genetically similar steelhead in the Lower Columbia Basin.

Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001

Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001
Author:
Publisher:
Total Pages: 271
Release: 2009
Genre:
ISBN:

The Bonneville Power Administration (BPA) funded the development of two master plans which outline the rationale, and general approach, for implementing a defined group of projects that are an integral part of a comprehensive watershed goal to 'Protect, enhance and restore wild and natural populations of anadromous and resident fish within the Hood River Subbasin'. The Hood River Production Master Plan and the Pelton Ladder Master Plan were completed in 1991 and subsequently approved by the Northwest Power Planning Council in 1992. Action items identified in the two master plans, as well as in a later document entitled 'Hood River/Pelton Ladder Master Agreement' (ODFW and CTWSRO Undated), are designed to achieve two biological fish objectives: (1) to increase production of wild summer and winter steelhead (Oncorhynchus mykiss) to levels commensurate with the subbasins current carrying capacity and (2) re-establishing a self-sustaining population of spring chinook salmon (Oncorhynchus tshawytscha). Numerical fish objectives for subbasin escapement, spawner escapement, and subbasin harvest are defined for each of these species in Coccoli (2000). Several projects are presently funded by the BPA to achieve the Hood River subbasin's numerical fish objectives for summer and winter steelhead and spring chinook salmon. They include BPA project numbers 1998-021-00 (Hood River Fish Habitat), 1998-053-03 (Hood River Production Program - CTWSRO: M & E), 1998-053-07 (Parkdale Fish Facility), 1998-053-08 (Powerdale/Oak Springs O & M), and 1998-053-12 (Hood River Steelhead Genetics Study). Collectively, they are implemented under the umbrella of what has come to be defined as the Hood River Production Program (HRPP). The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Strategies for achieving the HRPP's biological fish objectives for the Hood River subbasin were initially devised based on various assumptions about (1) subbasin carrying capacity, (2) survival rates for selected life history stages, and (3) historic and current escapements of wild, natural, and hatchery stocks of anadromous salmonids to the Hood River subbasin. The Oregon Department of Fish and Wildlife began funding a monitoring and evaluation (M & E) project in December 1991 to collect the quantitative biological information needed to (1) more accurately assess the validity of these assumptions and (2) evaluate the proposed hatchery supplementation component of the HRPP. Bonneville Power Administration assumed funding of the M & E project in August 1992. The M & E project was initially confined to sampling anadromous salmonids escaping to an adult trapping facility operated at Powerdale Dam; which is located at River Mile (RM) 4.5 on the mainstem of the Hood River. Stock specific life history and biological data was collected to (1) monitor subbasin spawner escapements and (2) collect pre-implementation data critical to evaluating the newly proposed HRPP's potential biological impact on indigenous populations of resident fish. The scope of the M & E project was expanded in 1994 to collect the data needed to quantify (1) subbasin smolt production and carrying capacity, (2) smolt to adult survival rates, and (3) the spatial distribution of indigenous populations of summer and winter steelhead, spring and fall chinook salmon, and coho salmon. A creel was incorporated into the M & E project in December 1996 to evaluate the HRPP with respect to its defined subbasin and spawner escapement objectives for Hood River stocks of wild and hatchery summer and winter steelhead and for natural and Deschutes stock hatchery spring chinook salmon. In 1996, the M & E project also began monitoring streamflow at various locations in the Hood River subbasin. Streamflow data will be used to correlate subbasin smolt production with summer streamflows. Data collected from 1991-1999 is reported in the following annual progress reports: Olsen et al. (1994), Olsen et al. (1995), Olsen and French (1996), Olsen et al. (1996), Olsen and French (1999), and Olsen and French (2000). The annual progress reports document information collected on (1) rearing densities of indigenous fish, (2) subbasin steelhead smolt production, (3) post-release survival of acclimated and direct released hatchery summer and winter steelhead smolts, (4) smolt to adult anadromous salmonid survival rates, (5) jack and adult anadromous salmonid escapements and harvest, (6) spatial distribution of adult anadromous salmonid holding in the Hood River subbasin, (7) selected life history patterns and morphological and meristic characteristics of wild, natural, and hatchery resident and anadromous salmonids, and (8) summer streamflows.

Hood River and Pelton Ladder Evaluation Studies, 1998-1999 Annual Report

Hood River and Pelton Ladder Evaluation Studies, 1998-1999 Annual Report
Author:
Publisher:
Total Pages: 212
Release: 2000
Genre:
ISBN:

This report summarizes the life history and production data collected in the Hood River subbasin during FY 1998 and 1999. Included is a summary of jack and adult life history data collected at the Powerdale Dam trap on eight complete run years of winter steelhead, spring and fall chinook salmon, and coho salmon, and on seven complete run years of summer steelhead. Also included are summaries of (1) the hatchery winter steelhead broodstock collection program; (2) hatchery production releases in the Hood River subbasin; (3) the number of outmigrant wild rainbow-steelhead and hatchery summer and winter steelhead smolts; and (4) streamflow at selected locations in the Hood River subbasin. Data will be used in part to (1) evaluate the HRPP with respect to its impact on indigenous populations of resident and anadromous salmonids, (2) refine spawner escapement objectives to more accurately reflect subbasin carrying capacity, and (3) refine estimates of subbasin smolt production capacity to more accurately reflect current and potential subbasin carrying capacity. Baseline information on indigenous populations of resident and anadromous salmonids will continue to be collected for several years prior to full implementation of the Hood River Production Program.

Hood River and Pelton Ladder Evaluation Studies

Hood River and Pelton Ladder Evaluation Studies
Author:
Publisher:
Total Pages: 169
Release: 1995
Genre:
ISBN:

In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, a monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program's impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.

Hood River and Pelton Ladder Evaluation Studies

Hood River and Pelton Ladder Evaluation Studies
Author:
Publisher:
Total Pages: 169
Release: 1995
Genre:
ISBN:

In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, a monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program's impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.