Discrete Sampling Test Plan for the 200-BP-5 Operable Unit

Discrete Sampling Test Plan for the 200-BP-5 Operable Unit
Author:
Publisher:
Total Pages:
Release: 2010
Genre:
ISBN:

The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.

Waste Control Plan for the 200-BP-5 Operable Unit

Waste Control Plan for the 200-BP-5 Operable Unit
Author: Samuel P. Juracich
Publisher:
Total Pages: 5
Release: 2003
Genre:
ISBN:

This is the waste control plan for the management of investigation-derived waste generated from groundwater well sampling, aquifer tube sampling and seep sampling, aquifer testing, groundwater well or aquifer tube development, water level measurements, screening analysis liquids, and equipment decontamination for the 200-BP-5 groundwater operable unit.