With Heritage So Rich
Author | : United States Conference of Mayors. Special Committee on Historic Preservation |
Publisher | : |
Total Pages | : 238 |
Release | : 1983 |
Genre | : Technology & Engineering |
ISBN | : |
Download Financial Assistance For Transmission Lines Substations Switching Station Terminal Facilities And Barge Unloading Facility Alfl Environmental Assessment Ea Finding Of No Significant Impact Fonsi full books in PDF, epub, and Kindle. Read online free Financial Assistance For Transmission Lines Substations Switching Station Terminal Facilities And Barge Unloading Facility Alfl Environmental Assessment Ea Finding Of No Significant Impact Fonsi ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : United States Conference of Mayors. Special Committee on Historic Preservation |
Publisher | : |
Total Pages | : 238 |
Release | : 1983 |
Genre | : Technology & Engineering |
ISBN | : |
Author | : United States |
Publisher | : |
Total Pages | : 102 |
Release | : 1993 |
Genre | : Government publications |
ISBN | : |
Author | : United States. Marine Corps |
Publisher | : |
Total Pages | : 200 |
Release | : 1980 |
Genre | : Air defenses |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 170 |
Release | : 1995 |
Genre | : |
ISBN | : |
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).