Basewide Engineering Evaluation-Cost Analysis for Soil Vapor Extraction. Site Specific Document IC 7

Basewide Engineering Evaluation-Cost Analysis for Soil Vapor Extraction. Site Specific Document IC 7
Author:
Publisher:
Total Pages: 41
Release: 1993
Genre:
ISBN:

This document supports the use of soil vapor extraction (SVE) as the non-time critical removal action for selected areas with high levels of volatile organic compound (VOC) contamination in Investigation Cluster 7 (IC 7), which is located near the center of Operable Unit B (OU B). This SVE removal action is part of the initial basewide SVE removal action at McClellan Air Force Base (McAFB). The principal objective of basewide SVE removal actions is to achieve early risk reduction by removing a significant quantity of VOCs from soils in the vadose zone, intercepting an exposure pathway, or preventing additional flow to groundwater.