Final Joint Environmental Study For The Northern California Power Agency Geothermal Project No 2
Download Final Joint Environmental Study For The Northern California Power Agency Geothermal Project No 2 full books in PDF, epub, and Kindle. Read online free Final Joint Environmental Study For The Northern California Power Agency Geothermal Project No 2 ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Northern California Power Agency Geothermal Project No. 2
Author | : |
Publisher | : |
Total Pages | : |
Release | : 1979 |
Genre | : |
ISBN | : |
The following are included: project description, environmental setting, environmental impacts and mitigation measures, project alternatives and a summary of environmental consequences. (MHR).
Commission Decision on the Northern California Power Agency's Application for Certification for Geothermal Project No. 2
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 154 |
Release | : 1980 |
Genre | : Electric power-plants |
ISBN | : |
Commission Decision on the Northern California Power Agency's Application for Certification for Geothermal Project No. 2. Docket 79-AFC-2
Author | : |
Publisher | : |
Total Pages | : |
Release | : 1980 |
Genre | : |
ISBN | : |
The text of the Decision is presented in narrative form. Included are: findings on compliance with statutory site certification requirements, a discussion of the Joint Environmental Study and its significance in terms of the California Environmental Quality and National Environmental Policy Acts, a brief recapitulation of the procedural steps which occurred, and a summary of the evidentiary bases for this Decision. Also presented are topical discussions on the various human and natural environmental areas impacted by the project, as well as the technical, engineering, and other areas of concern affected by the project. These topical discussions summarize the basis for the Commission's ultimte Findings and Conclusions pertaining to each broad cetegory. (MHR).
Final Report on the Northern California Power Agency's Notice of Intention to Seek Certification for Geothermal Project No. 1
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 92 |
Release | : 1980 |
Genre | : Electric power-plants |
ISBN | : |
Final Report on the Northern California Power Agency's Notice of Intention to File an Application for Certification of NCPA Geothermal Project No. 2
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 166 |
Release | : 1979 |
Genre | : Geothermal power plants |
ISBN | : |