Feasibility of Serving the Plumas County Flood Control and Water Conservation District From the State Water Project (Classic Reprint)

Feasibility of Serving the Plumas County Flood Control and Water Conservation District From the State Water Project (Classic Reprint)
Author: California Department Of Wate Resources
Publisher: Forgotten Books
Total Pages: 70
Release: 2018-02-23
Genre: Business & Economics
ISBN: 9780282284190

Excerpt from Feasibility of Serving the Plumas County Flood Control and Water Conservation District From the State Water Project In November 1960, the California Water Resources Development Bond Act was approved by the State's electorate, paving the way for the construction of the State Water Project. Since that time, many local water service agencies throughout the state have applied to the Department of Water Resources for consideration as potential contractors with the State for water service from the proposed facilities. Several water agencies have been organized and formed since November 1960 expressly for the purpose of obtaining supplemental water supplies from the State facilities for the areas they represent. Prior to executing contracts for a water supply with public agencies, the Department of Water Resources made studies of those agencies and the areas encompassed by them to determine the propriety of entering into such contracts. These studies were made with the goal of evala ating (1) each area's future demand for supplemental water supplies, (2) the legal ability of each agency in question to enter into a water supply contract with the State, (3) the engineering feasibility of providing the proposed water service, and (4) the financial ability of each agency and its constituent area to bear the financial burden necessarily imposed upon it by a water supply contract with the State. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving Butte County from the State Water Project (Classic Reprint)

Feasibility of Serving Butte County from the State Water Project (Classic Reprint)
Author: California Department of Wate Resources
Publisher: Forgotten Books
Total Pages: 74
Release: 2017-04-18
Genre: Business & Economics
ISBN: 9780259103059

Excerpt from Feasibility of Serving Butte County From the State Water Project In November 1960, the California Water Resources Development Bond Act was approved by the State's electorate, paving the way for the construction of the State Water Project. Since that time, many local water service agencies throughout the State have applied to the Department of Water Resources for consideration as potential con tractors with the State for water service from the proposed facilities. Several water agencies have been organized since November 1960 ex pressly for the purpose of obtaining supplemental water supplies from the State facilities for the areas they represent. Prior to executing contracts for a water supply with public agencies, the Department of Water Resources made studies of those agencies and the areas encompassed by them to determine the propriety of entering into such contracts. These studies were made with the goal of evaluating (1) each area's future demand for supplemental water supplies, (2) the legal ability of each agency in question to enter into a water supply contract with the State, (3) the engineering feasibility of providing the proposed water service, and (4) the financial ability of each agency and its constituent area to bear the financial burden necessarily imposed upon it by a water supply contract with the State. The results of the studies made of each agency, as de scribed above, along with supporting material, have been embodied in separate reports and have, or will be, published by the Department of Water Resources for the benefit of interested agencies and persons. This bulletin, dealing with the County of Butte, is one of a series of such publications. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving the Oak Flat Water District From the State Water Project (Classic Reprint)

Feasibility of Serving the Oak Flat Water District From the State Water Project (Classic Reprint)
Author: California Department of Wate Resources
Publisher:
Total Pages: 66
Release: 2016-06-27
Genre: Reference
ISBN: 9781332974894

Excerpt from Feasibility of Serving the Oak Flat Water District From the State Water Project Unit values of Applied Water for Creps Projected in Oak Flat Water District. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Feasibility of Serving the Mojave Water Agency From the State Water Project

Feasibility of Serving the Mojave Water Agency From the State Water Project
Author:
Publisher:
Total Pages: 108
Release: 2015-08-05
Genre: Business & Economics
ISBN: 9781332260898

Excerpt from Feasibility of Serving the Mojave Water Agency From the State Water Project: December 1965 In November 1960, the California Water Resources Development Bond Act, (Chapter 6 (commencing with Section 129), Part 6, Division 6 of the Main Code) was approved by the States electorate, paving the way for the construction of the State Water Project. Since that time, many local water service agencies throughout the State have applied to the Department of Water Resources for consideration as potential contractors with the State for water service from the proposed facilities. Several water agencies have been organized and formed since November 1960 expressly for the purpose of obtaining supplemental water supplies from the State facilities for the areas they represent. Prior to executing contracts for water service with public agencies, the Department of Water Resources made studies of those agencies and the areas encompassed by them to determine the propriety of entering into such contracts. These studies were made with the goal of evaluating (l)each areas future demand for supplemental water supplies; (2) the legal ability of each agency in question to enter into a water supply contract with the State; (3) the engineering feasibility of providing the proposed water service; (4) the financial ability of each agency and its constituent area to bear the financial burden necessarily imposed upon it by a water supply contract with the State. The results of the studies made for each agency, along with significant incidental and supporting material, have been embodied in separate reports which have or will be published by the Department of Water Resources for the benefit of interested agencies and persons. This bulletin, dealing with the Mojave Water Agency, the Morongo Valley Community Services District, and the Yucca Valley-Joshua Tree territory in San Bernardino County, is one of a series of such publications. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Water Management Plan

Water Management Plan
Author:
Publisher: Forgotten Books
Total Pages: 312
Release: 2018-02-22
Genre: Reference
ISBN: 9780666124050

Excerpt from Water Management Plan: Yolo County Flood Control and Water Conservation District; October, 2000 Purchase of the Clear Lake Water Company, 1967 Construction of Indian Valley Dam and Reservoir, 1976 Construction of Chapman Reservoir, 1978 Established the Moore Wildlife Sanctuary, 1979 Construction of Indian Valley Dam Hydroelectric Project, 1983 Yolo County Water Plan, 1984, and Water Plan Update, 1992 Construction of Cache Creek Dam Hydroelectric Project, 1986 Stopped Dredging of Clear Lake Outlet Channel, 1988 Challenged eir for Discharge of Effluent into Cache Creek, 1989 Negotiated Highway 113 Under Crossings for Future Drainage, 1990 Department of Water Resources Drought Water Bank, 1992 Habitat Alliance and Wildlife Keepers 1992 Capay Diversion Dam Modifications, 1994 Guidelines for Reviewing Water Transfers in Yolo County, 1994 Sacramento River Water Appropriation Application, 1994 Cache Creek Water Appropriation Application, 1994 Natural Resource Conservation Service (nrcs) Emergency Watershed Protection Project, 1995, 1998 Streamflow and Weather Monitoring, Groundwater Export Ordinance Amendment, 1997 Elevated Crest of Indian Valley Dam, 1998 bay-delta Hearings, 1998 Tamarisk and Arundo Removal Modification of Cache Creek Dam, 1998 Emergency Stabilization of Guinda Bridge, 1998 Water Management Plan October 2000. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Rural Development

Rural Development
Author: United States. General Accounting Office
Publisher:
Total Pages: 20
Release: 1989
Genre: Water
ISBN: