Long-Term Channel Maintenance Plan for the Federal Commercial Harbor and a Permit Application to Construct and Expand Barge Terminal Facilities in the East Channel of the Upper Mississippi River at Prairie Du Chien, Wisconsin

Long-Term Channel Maintenance Plan for the Federal Commercial Harbor and a Permit Application to Construct and Expand Barge Terminal Facilities in the East Channel of the Upper Mississippi River at Prairie Du Chien, Wisconsin
Author:
Publisher:
Total Pages: 424
Release: 1996
Genre:
ISBN:

The purpose of this document is to analyze the environmental impacts of a proposed permit action to upgrade and expand an existing barge transloading facility at St. Feriole Island for Prairie Sand and Gravel Inc., and the Corps of Engineers proposed Long-Term Channel Maintenance Plan for the federal commercial harbor in the East Channel of the Mississippi River at Prairie du Chien. The purpose of the proposed actions is to provide for environmentally sustainable public and/or private commercial navigation, including harbor and terminal facilities, in the East Channel of the Mississippi River at Prairie du Chien to meet the need for continued growth and development. A variety of alternatives were developed and evaluated, four of which are evaluated in detail. The following significant resources would be affected by the proposed activities: (1) Freshwater mussels; (2) Federal and state-listed threatened and endangered mussel species; (3) cultural resources; (4) Mississippi River nine-foot channel project; (5) Upper Mississippi River Wildlife and Fish Refuge and (6) Wisconsin and Southern Railroad (W & SRR).

EIS Cumulative

EIS Cumulative
Author:
Publisher:
Total Pages: 330
Release: 1997
Genre: Environmental impact analysis
ISBN: