Early Site Permit Esp At The North Anna Esp Site
Download Early Site Permit Esp At The North Anna Esp Site full books in PDF, epub, and Kindle. Read online free Early Site Permit Esp At The North Anna Esp Site ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Draft Environmental Impact Statement for an Early Site Permit (ESP) at the North Anna ESP Site
Author | : U.s. Nuclear Reglatory Commission |
Publisher | : CreateSpace |
Total Pages | : 472 |
Release | : 2014-06-14 |
Genre | : Technology & Engineering |
ISBN | : 9781500202859 |
The staff of the U.S. Nuclear Regulatory Commission (NRC) has prepared this Supplement to the Draft Environmental Impact Statement (EIS) for an Early Site Permit (ESP) at the North Anna ESP Site (SDEIS) because Dominion Nuclear North Anna, LLC (Dominion or applicant) amended its ESP application, as described in Revision 6 to its application for an ESP. In Revision 6 (which was submitted to the NRC on April 13, 2006), Dominion described a new approach for cooling its proposed Unit 3. Under the revised approach, Unit 3 would use a closed-cycle cooling system, rather than the originally proposed once-through cooling system. The newly-proposed system would not use the 1376-ha (3400-ac) waste heat treatment facility for cooling. Dominion also proposed to increase the power level of both proposed Units 3 and 4 from 4300 megawatts-thermal (MW(t)) to 4500 MW(t).
Nuclear Regulatory Commission Issuances
Author | : U.S. Nuclear Regulatory Commission |
Publisher | : |
Total Pages | : 574 |
Release | : 2007 |
Genre | : Nuclear energy |
ISBN | : |
Safety Evaluation Report for an Early Site Permit (ESP) at the North Anna ESP Site
Author | : U.s. Nuclear Regulation Comion |
Publisher | : CreateSpace |
Total Pages | : 102 |
Release | : 2014-07-22 |
Genre | : Technology & Engineering |
ISBN | : 9781500610838 |
Dominion Nuclear North Anna, LLC submitted its application for an early site permit (ESP) for the North Anna site on September 25, 2003. Then, on April 13, 2006, Dominion submitted Revision 6 of the application to propose a change tothe cooling system for postulated Unit 3, and an increase in the power level for both postulated Units 3 and 4.