Draft Remedial Investigation Report for Remedial Investigation/feasibility Study at GMC-CFD Massena Facility

Draft Remedial Investigation Report for Remedial Investigation/feasibility Study at GMC-CFD Massena Facility
Author: RMT, Inc
Publisher:
Total Pages:
Release: 1986
Genre: Aluminum founding
ISBN:

Volume II of the report remedial investigation / feasibility study at GMC-CFD Massena facility is constitued of seven (7) appendices: A: Boring logs for monitoring wells installed during the RI; B: Boring logs for soil and waste borings; C: Well construction diagrams for RI monitoring wells; D: Boring logs and well construction diagrams from previous investigations; E: Results of laboratory grain-size analyses; F: Results of laboratory permeability tests and G: Results of single-well response tests

Phase II Remedial Investigation at the GMC-CFD Massena Facility

Phase II Remedial Investigation at the GMC-CFD Massena Facility
Author: RMT, Inc
Publisher:
Total Pages: 101
Release: 1988
Genre:
ISBN:

A remedial investigation/feasibility study (RI/FS) has been underway at the General Motors Corporation, Central Foundary Division (GM), facility in Massena, New York, under USEPA Administrative Order. This report presents the results of the second phase of the remedial investigation (RI II). The USEPA completed the review of the Draft Remedial Investigation (RI) report in November 1986 and requested additional investigations that included: surfacial soil sampling, soil and waste borings, monitoring well repair and installation, sampling of monitoring wells, and sampling of residential water supplies.