Critical Path Analysis In Practice
Download Critical Path Analysis In Practice full books in PDF, epub, and Kindle. Read online free Critical Path Analysis In Practice ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : Gail Thornley |
Publisher | : Routledge |
Total Pages | : 176 |
Release | : 2013-10-11 |
Genre | : Medical |
ISBN | : 1136438246 |
Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences. This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press. Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.
Author | : Gail Thornley |
Publisher | : |
Total Pages | : |
Release | : |
Genre | : Critical path analysis |
ISBN | : |
Author | : James M. Antill |
Publisher | : |
Total Pages | : 296 |
Release | : 1965 |
Genre | : Architecture |
ISBN | : |
Analysis of mathematics techniques of planning and management used in the construction industry and known as critical path methods (cpm) - covers the use of computers, and includes a comparison of cmp and pert (programme evaluation and review techniques) of network analysis.
Author | : Gail Thornley |
Publisher | : Psychology Press |
Total Pages | : 176 |
Release | : 2001 |
Genre | : Business & Economics |
ISBN | : 9780415264723 |
Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences. This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press. Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.
Author | : |
Publisher | : |
Total Pages | : |
Release | : 1964 |
Genre | : Critical path analysis |
ISBN | : |
Author | : James M. Antill |
Publisher | : John Wiley & Sons |
Total Pages | : 446 |
Release | : 1991-01-08 |
Genre | : Technology & Engineering |
ISBN | : 9780471620570 |
An updated and revised edition of the standard work on the use of critical path methods (CPM) in the construction industry. Describes the mechanics and procedures of CPM in construction planning and works control and demonstrates its application to large and small projects alike. Emphasis is not on the mathematics--the stress here is on the solution of problems commonly encountered in construction practice.
Author | : Operational Research Society (LONDON). Critical Path Analysis Study Group |
Publisher | : |
Total Pages | : 151 |
Release | : 1968 |
Genre | : |
ISBN | : |
Author | : A. T. Armstrong-Wright |
Publisher | : Harlow : Longmans |
Total Pages | : 136 |
Release | : 1969 |
Genre | : Technology & Engineering |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : |
Release | : |
Genre | : |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : 42 |
Release | : 1964 |
Genre | : Critical path analysis |
ISBN | : |