Conditions of Contract for Design-build and Turnkey

Conditions of Contract for Design-build and Turnkey
Author: Fédération internationale des ingénieurs-conseils
Publisher:
Total Pages: 75
Release: 1995
Genre: Construction contracts
ISBN: 9782884320108

The terms of the Conditions of Contract for Design - Build and Turnkey have been prepared by the Federation Internationale des Ingenieurs Conseils (FIDIC) and are recommended for general use for the purpose of the design and construction of works where tenders are invited on an international basis; with minor modifications, the Conditions are also suitable for use on domestic contracts.

FIDIC Silver Book

FIDIC Silver Book
Author: Jakob B. Sørensen
Publisher:
Total Pages: 0
Release: 2019
Genre: Construction contracts
ISBN: 9780727764362

Understanding and Negotiating Turnkey and EPC Contracts

Understanding and Negotiating Turnkey and EPC Contracts
Author: Joseph A. Huse
Publisher: Sweet & Maxwell
Total Pages: 1000
Release: 2002
Genre: Law
ISBN: 9780421674103

This work aims to keep criminal lawyers up to date with the latest cases and legislation, and includes longer articles analyzing current trends and important changes in the law. Drawing all aspects of the law together in one regular publication, it allows quick and easy reference

FIDIC - A Guide for Practitioners

FIDIC - A Guide for Practitioners
Author: Axel-Volkmar Jaeger
Publisher: Springer Science & Business Media
Total Pages: 468
Release: 2009-11-11
Genre: Law
ISBN: 364202100X

In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 ‘‘Orange Book’’). These conditions, known as the ‘‘FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer’s Representative as one of the parties.

FIDIC Users' Guide

FIDIC Users' Guide
Author: Brian W. Totterdill
Publisher: Thomas Telford
Total Pages: 424
Release: 2006
Genre: Law
ISBN: 9780727734419

The FIDIC Conditions of Contract for Construction and the Conditions of Contract for Plant and Design-Build (known as the 1999 Red Book and the 1999 Yellow Book) were first published in 1999 and have been used for a large number of contracts around the world. During 2005, FIDIC and the multilateral development banks cooperated to publish the MDB Harmonised Conditions of Contract for Construction. This book is a revised and extended edition of the authors earlier guides.

An Employer's and Engineer's Guide to the FIDIC Conditions of Contract

An Employer's and Engineer's Guide to the FIDIC Conditions of Contract
Author: Michael D. Robinson
Publisher: John Wiley & Sons
Total Pages: 229
Release: 2013-04-22
Genre: Law
ISBN: 1118385608

When all parties involved in the construction process fully understand their roles and are able to anticipate potential points of conflict, disputes and delays will be minimised. The Employer’s and Engineer’s Guide to the FIDIC Conditions of Contract sets out the essential administrative requirements of a FIDIC based contract by reference to the FIDIC 1999 Red Book. The obligations and duties of the Employer and the Engineer are identified and discussed. Potential pitfalls are highlighted and likely consequences pointed out. The importance of the Employer’s role in the preparation of tenders, which fully reflect his requirements and duties and obligations arising in the execution of the works, is emphasised. The key role of the Engineer in the effective administration of contracts after award is examined and commentary provided. Included in the guide are a number of appendices, including model letters which will be of value to less experienced staff (particularly those whose mother-tongue is not the English language). Engineers, quantity surveyors and project managers engaged in the contractual administration of international projects using FIDIC forms of contract will find the concise guidance in simple and jargon-free language provided here invaluable. This, together with the author’s earlier book, Contractor’s Guide to the FIDIC Conditions of Contract - which describes the duties, rights and responsibilities of the Contractor – represents the totality of supervision, design and execution of construction projects executed under the FIDIC Conditions of Contract. This book’s companion website offers invaluable resources to freely download, adapt and use: Model letters for use by the Employer Model letters for use by the Contractor Sample Interim Payment Certificate Model Form for Submissions to the Engineer Model Form of Engineer’s Order for Varied Works Model Form of Daywork/Daily Record Sheets