Commission Decision on the Northern California Power Agency's Application for Certification for Geothermal Project No. 2
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 154 |
Release | : 1980 |
Genre | : Electric power-plants |
ISBN | : |
Download Commission Decision On The Northern California Power Agencys Application For Certification For Geothermal Project No 2 full books in PDF, epub, and Kindle. Read online free Commission Decision On The Northern California Power Agencys Application For Certification For Geothermal Project No 2 ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 154 |
Release | : 1980 |
Genre | : Electric power-plants |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : |
Release | : 1980 |
Genre | : |
ISBN | : |
The text of the Decision is presented in narrative form. Included are: findings on compliance with statutory site certification requirements, a discussion of the Joint Environmental Study and its significance in terms of the California Environmental Quality and National Environmental Policy Acts, a brief recapitulation of the procedural steps which occurred, and a summary of the evidentiary bases for this Decision. Also presented are topical discussions on the various human and natural environmental areas impacted by the project, as well as the technical, engineering, and other areas of concern affected by the project. These topical discussions summarize the basis for the Commission's ultimte Findings and Conclusions pertaining to each broad cetegory. (MHR).
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 166 |
Release | : 1979 |
Genre | : Geothermal power plants |
ISBN | : |
Author | : |
Publisher | : |
Total Pages | : |
Release | : 1979 |
Genre | : |
ISBN | : |
Final findings and conclusions are presented on: conformity to the forecast of statewide and service area electric power demands; conformity of the proposed site and facility with applicable local, regional, state, and federal standards, ordinances, and laws; and the safety and reliability of the facility. Also included is a proposed decision approving the notice, with conditions, for consideraion by the full Commission. In addition, a description of the proposed project, a summary of the proceedings to date; local, state, and federal government agency comments on the Preliminary Report; and the Committee's view of those issues that require further consideration are included. (MHR).
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 92 |
Release | : 1980 |
Genre | : Electric power-plants |
ISBN | : |
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 90 |
Release | : 1986 |
Genre | : Coldwater Creek Geothermal Power Plant Project (CCPA no. 1) |
ISBN | : |
Author | : California Energy Commission |
Publisher | : |
Total Pages | : 78 |
Release | : 1979 |
Genre | : Electric power-plants |
ISBN | : |